Reference list of investments completed
- FAMET Process Equipment and Machinery Inc in Kędzierzyn Koźle – project construction design preparation together with installation of a heating system in the production halls,
- Eurocentrum Katowice for Agrocom, LLC – cooling technology installation, central heating, the heat source installation, mechanical ventilation installation,
- PiUOK Sosnowiec Investor: Kargon - syphonic of QS Wavin roof drainage,
- FAMET Process Equipment and Machinery Inc in Jedrzejów – reconstruction of the gas installation and retooling of equpment in the halls,
- UMA LLC – preparation of a concept, project building design to obtain a construction permit along with delivery, installation and commissioning of a heating system in a production hall,
- Eurocash Krosno for Goldbeck Inc – comprehensive HVAC, water and sewage, gas, ventilation, air conditioning installation, along with the realization of executive projects designs for the task to be perfomed. G. W. Goldbeck,
- Makar Katowice – rainwater sewage system, sanitation facility, water supply, drinking water facility and hydrant system, sanitary sewage system, syphonic of QS Wavin roof drainage, heating installation, ventilation system installation,
- Lear Corporation 2 in Tychy – delivery and installation of the heating system,
- Przedsiębiorstwo Komunikacji Miejskiej Sp. z o.o. in Sosnowiec – implementation of the heating installation in the main hall in PKM Sp. z o.o branch in Będzin, ul. Promyka 30, i.e Infra gas-heaters, Eolo Vip gas-heaters, internal gas installation of steel pipes,
- MTL Asco LLC Pyskowice – delivery and installation of the C.O. 60 kW, dismantling of the existing node,
- Aluron LLC – installation of ventilation and air conditioning in the office building, internal water, sewerage and heating installation in the office building, expansion of the production hall ventilation system with a cooling system and execution of the designs for the above installations,
- Saba LLC. Katowice – implementation of the heating installation in the hall with Infra gas-heaters, internal gas installation of steel pipes,
- FAMET Process Equipment and Machinery Inc in Opole – project construction design preparation together with installation of a heating system in the production hall,
- Firma Budowlano-Consultingowa "IKA" Jarosław Wójcik Bielsko Biała – works related to HVAC installation, water and sewage installations inside TOUS commercial premises, in CH Galeria Katowicka, a shopping center in Katowice,
- Rafamet in Kuźnia Raciborska for Proinvest – execution of the external networks: sanitation facility /sanitary sewage system, storm water drainage system, water connections, heating network, compressed air; and internal installations: heating node, ventilation and air conditioning, CT installation, ventilation of the hall and office, water and sewage, c.o. , syphonic roof drainage installations,
- Warehouse-production hall with a social amenties for Buma Inc – comprehensive HVAC installation, water and sewage, gas, ventilation, air conditioning, compressed air installation, hydrant system installation,
- Sport Club Puszcza in Niepołomice – execution of HVAC installation, sewage storm water and sanitary facility systems installation,
- Extral in Żory – execution of of a syphonic roof drainage installation,
- Glassworks in Czestochowa – execution of a syphonic drainage system for the roof,
- Panattoni in Sosnowiec for Bremer LLC – comprehensive HVAC installation, water and sewage, gas, ventilation, air conditioning, along with the realization of executive projects designs,
- Metchem Pilzno – execution of a syphonic roof drainage installation in the hall, ventilation, heating with gas radiators, compressed air installations, nitrogen, oxygen, gas mixtures; HVAC installation in the office, water and sewage system installations,
- Promar in Zawiercie for Proinvest – execution in the office installation: underfloor heating, radiator, ventilation, cooling installation with fan coils, technological ventilation, boiler room, water and sewage system installations for the hall: ventilation, heating, hydrant, compressed air and ice water installations. What is more, dedusting installation, execution of a syphonic roof drainage installation,
- Schilsner Group SLLC. in Wrocław for Adamietz LLC – comprehensive HVAC installation, water and sewage, gas, ventilation, air conditioning, execution of a syphonic roof drainage installation, compressed air installation,
- Intercars in Sosnowiec for Godlbeck LLC – comprehensive HVAC, water and sewage, gas, ventilation, air conditioning installation, along with the realization of executive projects designs for the task to be perfomed. G. W. Goldbeck,
- Logistics Center Segro in Nadarzyn for Godlbeck LLC – comprehensive HVAC, water and sewage, gas, ventilation, air conditioning installation, along with the realization of executive projects designs for the task to be perfomed. G. W. Goldbeck,
- Intercars in Sosnowiec for Godlbeck LLC – comprehensive HVAC, water and sewage systems, gas, ventilation, air conditioning installation, along with the realization of executive projects designs for the task to be perfomed. G. W. Goldbeck,
- Knorr in Gliwice – execution of a syphonic roof drainage installation,/li>
- Roca in Gliwice for Skanska S.A. – installation implementation: execution of a syphonic drainage system for the roof, underfloor heating, 2x150kW boiler room, c.o. installation, ct. heating installation with water heaters, hydrant system installation,
- WH7 hall in Modlniczce for Goldebck LLC – the realization of executive project design, gas installation with radiators, ventilation and water in the hall,
- Electrolux in Siewierz for Skanska S.A. - installation of air conditioning, water and sewage systems, c.o.,
- DC1 in Prologis PArk Stryków (Geis) for Kajima Poland LLC – the realization of executive projects designs; installations in the hall: ventilation, gas heating with radiators and heaters, roof drainage, hydrant system installation; installation in offices: water and sewage systems, air conditioning, ventilation, c.o. and c.t. boiler room,
- DC1B at Prologis PArk Stryków for Kajima Poland LLC – the realization of executive projects designs; installations in the hall: ventilation, gas heating with radiators, roof drainage, installation in offices: water and sewage systems, air conditioning, ventilation, c.o. and c.t. boiler room.